Madison awarded, begins work on, GlaxoSmithKline warehouse

Madison is currently performing foundation work for a new warehouse at the Upper Merion Township, Pa., location of pharmaceutical company GlaxoSmithKline. Madison’s contract consists of foundation construction work (including excavation and backfill), walls and slabs.

The 30,000-square-foot warehouse will house a 60,650-square-foot gross floor area. A portion of the building will contain a green roof and subsurface stormwater detention basin.

This entry was posted in Current News. Bookmark the permalink.